ATELIER CLIFTON LTD

Conversion of unused basement in to hair salon and nail bar.
Working along side the client to bring there idea to life we installed new power supplies for foot spa and basin units, all new dimmable LED lighting through out including low level LED stairwell illumination, LED back lights for custom made mirrors, LED lighting to light up fire place, LED track lights for work stations and LED wall lights.

IMG-20181204-WA0003.jpg
IMG-20181204-WA0004.jpg
IMG-20181204-WA0023.jpg
IMG-20181204-WA0002.jpg
IMG-20181204-WA0005.jpg
IMG-20181204-WA0006.jpg
IMG-20181204-WA0007.jpg
IMG-20181204-WA0008.jpg
IMG-20181204-WA0009.jpg
IMG-20181204-WA0010.jpg
IMG-20181204-WA0012.jpg
IMG-20181204-WA0011.jpg
IMG-20181204-WA0013.jpg
IMG-20181204-WA0014.jpg
IMG-20181204-WA0015.jpg
IMG-20181204-WA0016.jpg
IMG-20181204-WA0017.jpg
IMG-20181204-WA0018.jpg
IMG-20181204-WA0019.jpg
IMG-20181204-WA0020.jpg
IMG-20181204-WA0021.jpg
IMG-20181204-WA0022.jpg

COMPLETE NEW INSTALLATION OF UNIT TO BE USED AS A DATA CENTER SHOWROOM

This Job was carried out at one of our regular clients new unit and was going to be used as a data center show room.

Installation of all new containment including trunking, conduit, cable basket and cable tray.

All new power, lighting, data and intruder alarm was wired and connected, installation of new 3 phase distribution board and control circuits for emergency stop button circuit and last man out light switch.

Lighting installed was all LED and also had daylight harvesting for energy saving.


IMG_1719.jpg
IMG_1718.jpg
IMG_1721.jpg
IMG_1720.jpg
IMG_1723.jpg
IMG_1722.jpg
IMG_1724.jpg
IMG_1725.jpg
IMG_1727.jpg
IMG_1726.jpg
IMG_1729.jpg
IMG_1728.jpg
IMG_1730.jpg
IMG_1731.jpg
IMG_1732.jpg
IMG_1733.jpg
IMG_1735.jpg
IMG_1734.jpg

NEW LIGHTNING PROTECTION

Installation of new lightning protection on roof following fire damage.

IMG_1494.jpg
IMG_1493.jpg
IMG_1492.jpg
IMG_1495.jpg
IMG_1496.jpg
IMG_1498.jpg
IMG_1497.jpg

NEW UNIT IN FROME

After being let down by another electrician and having a tennant due to move in in 3 weeks time the landlord of this unit contacted us, and within 2 days we provided and lighting design and quote.
Once quote was agreed we installed all new metal and PVC containment, new power supplies, lighting as per design, new full fire alarm system and signed off in just over a week.
Leaving a week until the tennants moved in.

IMG_1297.jpg
IMG_1295.jpg
IMG_1296.jpg
IMG_1298.jpg
IMG_1299.jpg
IMG_1301.jpg
IMG_1300.jpg
IMG_1302.jpg
IMG_1303.jpg
Frome lighting design.jpg

KITCHEN REMODEL IN PORTISHEAD

In this kitchen refit we installed all new satin nickel power outlets and switches, new electric underfloor heating system, New LED plynth and pelmit lighting and LED downlights.

IMG-20181207-WA0002.jpg
IMG-20181207-WA0000.jpg
IMG-20181207-WA0001.jpg
IMG-20181207-WA0003.jpg
IMG-20181207-WA0005.jpg
IMG-20181207-WA0004.jpg
IMG-20181207-WA0006.jpg
IMG-20181207-WA0008.jpg

4 NEW BUILD HOUSES IN COTHAM

This job was carried out for one of our regular clients, 4 new build houses incorporating  LED lighting, satin nickel sockets and switches, external lighting and power and underfloor heating system

20171107_135137.jpg
20171107_135131.jpg
20171107_135129.jpg
20171114_063923.jpg
20171107_135225.jpg
20171107_135204.jpg
20171107_135154.jpg
20171107_135243.jpg
20171107_135305.jpg
20171107_135313.jpg
20171107_135321.jpg
20171107_135333.jpg
20171107_135356.jpg
20171107_135454.jpg
20171107_135400.jpg
20171107_135506.jpg
20171107_135426.jpg
20171107_135637.jpg
20171107_135545.jpg
20171114_063541.jpg
20171114_063517.jpg
20171114_063612.jpg

NEW GARAGE INSTALLATION IN BRISTOL

This installation was in a newly built under ground garage in Bristol.
We installed a new SWA mains supply to the garage, new consumer unit,  PVC containment, power outlets, power for saniflow, LED lighting and a New Tesla EV car charger.

IMG-20190129-WA0006.jpg
IMG-20190129-WA0011.jpg
IMG-20190129-WA0007.jpg
IMG-20190129-WA0003.jpg
IMG-20190129-WA0010.jpg

REFIT OF 2 CLASSROOMS, STOREROOM, TOILETS AND CORRIDORS FOLLOWING FIRE DAMAGE

This school in Bristol had classrooms, storeroom, toilets and adjacent corridors completely rewired following fire damage.
The power, LED lighting, ventilation systems and door access systems were completely rewired and renewed working closely along side other contractors this project was completed in under 12 weeks

20171130_133051.jpg
20171130_133129.jpg
20171130_133112.jpg
20171127_045546.jpg
20171127_045559.jpg
20171127_045616.jpg
20171127_045623.jpg
20171127_045633.jpg
20171130_132522.jpg
20171130_132559.jpg
20171130_132544.jpg
20171130_132616.jpg
20171130_132658.jpg
20171130_132715.jpg
20171130_132735.jpg
20171130_132739.jpg
20171130_132752.jpg
20171130_132846.jpg
20171130_132816.jpg
20171130_132806.jpg
20171130_132855.jpg
20171130_132901.jpg
20171130_132915.jpg
20171130_133035.jpg
20171130_133031.jpg
20171130_133041.jpg

COMPLETE REWIRE OF SHOP AND ACCOMMODATION ABOVE FOLLOWING FIRE DAMAGE

Installation of all new power, LED lighting 3 phase distribution board following fire damage

20170731_124056.jpg
20170731_124028.jpg
20170731_124109.jpg
20170731_124138.jpg
20170731_124114.jpg
20170731_124128.jpg
20170731_130916.jpg
20170731_130904.jpg
20170731_130953.jpg

07808010741 - 07931 684073

9b, Block 15 Cater Road Business Park, Bristol BS13 7TW, UK

©2020 by switched live electrical.

IMG-20181204-WA0011.jpg